Goverment of Nepal
Ministry of Energy, Water Resources & Irrigation
Department of Water Resources & Irrigation

Bagmati Improvement Project

Project Implementation (Irrigation Unit)
Guheshwori, Gaurighat, Kathmandu
logo
  • About Us
    • Introduction
    • Organization Structure
    • Citizen Charter
    • Employee Details
    • Ex Employees
    • Ex Project Heads
  • Dhap Dam
    • Introduction
    • Sailent Features
    • Location & Accessibility
    • Work Components
    • Contract Details
    • Design & Quality Aspects
    • Environmental Aspects
    • Maps of Dam
  • Contract
  • News/Notice
  • Progress
  • Construction
    • Tests & QA/ QC
      • Material Tests
      • Work Tests
      • Documentation
    • Construction Equipments
      • Earth moving & Compaction
      • Concreting Equipments
      • Grouting Equipments
      • Brazing Equipments
      • Concreting Equipments
      • Lab Equipments
      • Geophysical Investigation Equipments
    • Designs/Drawings
    • Method of Statements
    • Footages
      • Work Footages
      • Test Footages
  • Policy/Law
    • Act and Regulations
    • Strategy, Plan and Policies
  • Gallery
    • Photos
    • Videos
  • Contact Us
  • Live Data
    • AWS
    • Instrumentation Structure
  • About Us
    • Introduction
    • Organization Structure
    • Citizen Charter
    • Employee Details
    • Ex Employees
    • Ex Project Heads
  • Dhap Dam
    • Introduction
    • Sailent Features
    • Location & Accessibility
    • Work Components
    • Contract Details
    • Design & Quality Aspects
    • Environmental Aspects
    • Maps of Dam
  • Contract
  • News/Notice
  • Progress
  • Construction
    • Tests & QA/ QC
      • Material Tests
      • Work Tests
      • Documentation
    • Construction Equipments
      • Earth moving & Compaction
      • Concreting Equipments
      • Grouting Equipments
      • Brazing Equipments
      • Concreting Equipments
      • Lab Equipments
      • Geophysical Investigation Equipments
    • Designs/Drawings
    • Method of Statements & Reports
    • Footages
      • Work Footages
      • Test Footages
  • Policy/Law
    • Act and Regulations
    • Strategy, Plan and Policies
  • Gallery
    • Photos
    • Videos
  • Contact Us
  • Live Data
    • AWS Dhap
    • EWS Dhap
    • Instrumentation Dhap
    • Hydrological Station Nagmati
  • Login
  • Admin
Home // Recent Activity / Recent Activity Detail
Sharing of experiences gained from the implementation of Dhap Dam with DWSSM
04 Aug. 2023
  • Share

It was a great pleasure to have an opportunity for Sharing experiences gained from the implementation of Dhap Dam with Department of Water Supply and Sewerage Management dated31st July 2023.

Recent Activities

Farewell program of Piiu chief Er. Nishchal Chhatkuli

05 Sept. 2024

यी नौ दिन बागमतीमा हुन्छ दोब्बर पानी

12 Aug. 2024

३२ कराेड लिटर पानी सुन्दरीजल पानी प्रशाेधन शाखामा प्रवाह गरीने ।

07 June 2024

पूर्व राष्ट्रपतिद्धारा धाप ड्यामको अवलोकन

04 June 2024

मातातिर्थ औशीमा पानी छोड्ने निर्णय

04 June 2024

Welcome and Farewell programe

22 Sept. 2023

Sharing of experiences gained from the implementation of Dhap Dam with DWSSM

04 Aug. 2023

demo

04 Aug. 2023

View all

Contact Us

  • Project Implementation Irrigation Unit, BRBIP, Guheswori, Kathmandu, Google Plus Code: P963+FV
  • 01-4114374
  • brbip.doi@gmail.com
  • http://dhapdam.gov.np/

Important Links

  • Ministry of Energy, Water Resources and Irrigation
  • Water and Energy Commission Secretariat
  • Department of Water Resources and Irrigation
  • Water Resource Research and Development Centre
View all

All Right Reserved. Bagmati Improvement Project Powered By: Uptechsys

Visitor: 56929
Login with

Log in to get in the moment updates on the things that interest you.

Forgot Password ?